Part Three
Of How I Spent My Summer
Continuing with those dreaded back-to-school assignments that the teachers always gave, we are now into August.
I had just enough log home stain to get a coat on the parts of two walls that were sanded and treated. When I went to Anchorage to buy more stain, I discovered that Home Depot no longer stocked the Behr Log Cabin stain and that I had to order it: 4 to 6 weeks because it had to come by barge!
That would definitely put me into the rainy August weather but I had no other option, so I ordered it.
Then, I started on the east wall, the one I've refinished three or four times already. It catches the worst of the bad weather and I decided, after some research, to use a different stain--Super Deck stain made for log homes.
| My neighbor Lou came over to sand the logs that were too high for me to reach. |
I was astonished to find out that some of these stains, Super Deck included, allowed the underlying wood to "turn gray naturally!" That's what I was trying to avoid.
Then, Super Deck log stain also isn't stocked and I had to order that , too, but was told about ten days.
Because of rainy days and wanting to keep the sanded logs dry, I decided to hang tarps to protect the east wall. This was done with the help of my neighbor Mike and pretty soon, Tarp Tunnel was done.
This included a long tarp hung from a second story dormer!
![]() |
| The white stuff on the brick mold around the door if called Peel Stop. Its purpose is to fill and smooth paint that has been peeling. Works great. |
![]() |
| Working on staining. |
![]() |
| Ladders, always ladders. Sometimes a plank laid between two ladders as a jerry-rigged scaffolding. |
| See the little stinker at right? He had to fly about ten feet behind the tarps! |
While I waited for the Super Deck stain to arrive, I sanded the logs above the carport. Then, stained them once I got the stain.
| More ladder scaffolding. |
![]() |
| I also refinished the log-and-a-half above my garage doors. I started working on the logs above, but decided that will go on next year's list of chores. |
Tah-dah! The finished east wall: logs, trim, and brick mold around the door.
![]() |
| The dark spot at left is just shadow. Note the brick mold around the door has been painted. |
The rest of the wall:
![]() |
| Note the logs. I restored all the log siding from the kitchen window down to the deck and the stain has aged so it blends right in with the upper logs. |
And that's the end of my What I Did this Summer essay. All in all, "I get by with a little help from my friends."
















